next
previous
items

Term

treatment capacity

Term
Waste treatment capacity for a waste recovery and disposal should be calculated as the total amount of waste allowed to be treated under facility permit/licence. Treatment capacity should be calculated for every disposal operation D1 - D11 and recovery operation R1 - R10 according to Annex II to Directive 75/442/EEC as amended by Commission Decision 96/350/EC. Total treatment capacity of waste facilities should be calculated as sum of capacities of waste disposal and waste recovery facilities.

Permalinks

Document Actions