next
previous
items

Figure

Projected change in river floods with a return period of 100 years

Figure Created 06 Nov 2012 Published 20 Nov 2012 Last modified 21 Dec 2016
1 min read
Projected change in the level of a 100-year maximum level of river discharge between the reference period 1961–1990 and the 2020s (left), 2050s (centre) and 2050s (right) based on an ensemble of 12 RCM simulations with LISFLOOD for the SRES A1B scenario.
Up one level

This folder has no visible items. To add content, press the add button, or paste content from another location.