next
previous
items

Figure

Exceedance of critical loads for acidification by deposition of nitrogen and sulphur compounds in 2020 assuming a Maximum Feasible Reductions scenario

Figure Created 12 Nov 2009 Published 05 Nov 2012 Last modified 29 Nov 2012
2 min read
The results were computed using the 2008 Critical Loads database hosted by the Coordination Centre for Effects (CCE).
Up one level

This folder has no visible items. To add content, press the add button, or paste content from another location.